First float half laminated

Categories: Bulkheads Floats

Wow. I didn’t expect to do this until tomorrow, but I was able to bribe Teresa with some Starbucks and she was the second set of hands to laminate the float half this evening. Put down an entire layer of fabric, then added extra reinforcements at the beam bulkheads before we started to spread the goo out.

Before:

307

After:

332

Didn’t take pictures, but I also laminated the bow bulkheads and glued together a long strip of 34″ foam for the stringer which I’ll finish up tomorrow.

Time Spent: 7 hours