Seemed like a slow day

Categories: Floats

I was at least hoping to have the inside of this float half sanded today, but it’s going to have to wait until tomorrow.  ~60*F ambient temperatures mean a longer cure for the bog and it was still tacky as of a few hours ago.  On the bright side, the remaining foam is planked and bogged:

500

And the cut the remaining foam needed to form the bow stringers all remaining float halves, the blocking that goes at the deck-flange and the float deck stiffeners:

504

With any luck, things will be cured tomorrow and I can fair the inside and start cutting and laying fabric.

Hours Worked: 6.5