I was at least hoping to have the inside of this float half sanded today, but it’s going to have to wait until tomorrow. ~60*F ambient temperatures mean a longer cure for the bog and it was still tacky as of a few hours ago. On the bright side, the remaining foam is planked and bogged:
And the cut the remaining foam needed to form the bow stringers all remaining float halves, the blocking that goes at the deck-flange and the float deck stiffeners:
With any luck, things will be cured tomorrow and I can fair the inside and start cutting and laying fabric.
Hours Worked: 6.5