Accomplished today’s goals

Categories: Bulkheads Floats

I went into today with two goals. I wanted to cut materials and infuse a second bulkhead and I wanted us to have the battens in place on the frames so we could start planking foam tomorrow.

Second infusion went much smoother this time. I read Steve’s CD and learned a lot from it on some simple mistakes I made the first time that made a world of difference.

185

Sadly, there was a casualty today. A fly found its way into the bag just before I finished sealing it and was lost in the process 🙁

192

It’s on top of the peel-ply, so he won’t be traveling with us on the boat.

We also layed down the battens on the form frames today. Came out nicely. Thinking about adding one or two more near the bilge area of the float (left side of picture) if the foam doesn’t lay well there.

195

Time spent: 4.5 hours