Was able to do a few more tasks on the first float half today. Spent some time cleaning up the edges from last night’s big lamination job. Went back and added 3″ of fabric on the deck-flange joint and then went to work finishing up the foam for the stringer. Once we got the shape and dimensions of the stringer right, I bedded it down with thickened epoxy. Placed the uni-directional fabric on it, wet out, then added the BD fabric over it, wet out.
Read More →
Wow. I didn’t expect to do this until tomorrow, but I was able to bribe Teresa with some Starbucks and she was the second set of hands to laminate the float half this evening. Put down an entire layer of fabric, then added extra reinforcements at the beam bulkheads before we started to spread the goo out.
Before:
307 After:
332 Didn’t take pictures, but I also laminated the bow bulkheads and glued together a long strip of 3⁄4″ foam for the stringer which I’ll finish up tomorrow.
Read More →
I just realized that I didn’t take a single picture of the completed center bulkhead that we unwrapped today from yesterday’s infusion. Regardless, that is complete and I infused the forward beam bulkhead today.
249 Majority of the time was spent with the first foam plank for the hull – as this is something we’d never done before and it took some trial and error to figure it all out.
Read More →