Another main hull update

Categories: Main Hull
Just a picture – I checked the web cam pictures that dad occasionally takes and it seems that he has done some more bogging on the deck and gunwale area so I’m posting a picture. 2266

More work on port half of main hull

Categories: Main Hull
Port side of the main hull is now planked and partially bogged. Of course, another cold-snap with temperatures in the 30’s, so the bog was still tacky the next afternoon and we were not able to sand it. 2259 At the time of this writing, we now have a full roll of B spec cloth, but it wasn’t there this weekend, so even if the bog cured enough to sand, we wouldn’t have been able to do much.

Read More →

First main hull bulkhead

Categories: Main Hull
I know it isn’t much, but I quickly ran out of time this weekend. Here’s a picture from the bow looking forward. Only need to plank a little more and then put the deck foam in place. 2251 Made a simple jig for positioning the aft cabin bulkhead 2248 As you can see, still need to dig out the foam in the access hole and back-fill with bog. Will do that next time a batch is mixed up (most likely when bogging the rest of the foam for the gunwale and deck.

Read More →