Forward beam mount lamination – part 1

Categories: Main Hull
… or… That’s a lot of fabric! We did the forward side of both forward beam mounts late last night – I don’t have a picture of it due to lighting, but it was a long 3 hours in a pretty cramped space. If you’ve thought about putting in the anchor-well before laminating this area – DON’T! 🙂 I’m very glad we haven’t installed it yet. The following two pictures are of the unidirectional fabrics and compression pad hard-wood.

Read More →

Cockpit work and starting on the forward beam mounts

Categories: Main Hull
Been slow going, but I took this week off from work to hopefully get “caught up” on things. Last time we managed to get the forward beam compression area formed up and laminated [singlepic id=26 w=320 h=240 mode=watermark float=] [singlepic id=27 w=320 h=240 mode=watermark float=] This was relatively straight-forward after confirming with Ian that the portion of the former that protrudes into the hull can be sanded more “flush” with the interior before laminating.

Read More →

Port-aft beam mount laminated

Categories: Main Hull
These pictures are from two weekends ago; everything has been slow going the past 2 months. Dad had some stuff come up that kept him unable to work on the boat for about 6 weeks. We managed to get this “little” bit done, and now I’ve come down with a nasty case of strep throat for the past week that isn’t reacting to antibiotics so I’m going back to the doctor tomorrow.

Read More →